Adjustable Pallet Racking

We have a vast range of adjustable pallet racking (APR) to suit all types of warehouse storage needs. As the premier storage center for Yorkshire and the North East, 2h Storage Solutions have expert knowledge built on years of practical experience.  In all industry sectors, we help you maximise space utilization, optimize material flow, ensure appropriate product access, and preserve the quality of the goods stored.

We design, install and maintain warehouse racking for manufacturers, wholesalers, retailers, and end-users. Our collaborative approach to storage installations ranges from straightforward to highly complex.  In every case, the quality of thinking, the attention to detail, and the application of experience and knowledge are simply second-to-none.

Whether you are planning a new warehouse, extending an existing facility, or replacing a racking system there is a wide range of pallet racking products to suit your needs. Whether it is increased density or a change from first-in last-out to first-in-first-out, our team has the solutions.

Types of warehouse pallet racking (APR)

  • Link 51
  • Apex
  • Dexion
  • Hi Lo premier
  • Hi lo KS
  • RediRack
  • PSS Planned Storage
  • Stow
  • Mecalux
  • Eurorack
  • Sperrin
  • Interlake Mecalux
  • Frazier Industrial Company
  • Wildeck
  • SSI Schaefer
  • Metalsistem
  • Aigner
  • Weland
  • Spieth

Adjustable pallet racking enables the safe storage of both palletised and non-palletised loads. Therefore making them a very cost-effective and versatile system.

With adjustable beams, this racking can be configured to accommodate changes in the type of goods stored wide aisles allow access by all types of truck and make loading and unloading an easy and efficient process.

For a site survey please contact us on 01937 585057 today. 

Customized Racking System Design for Hitachi Rail Europe Limited

This project involved creating a tailored racking system to efficiently accommodate a diverse range of parts, pallets, and train subcomponents, ensuring compliance with technical and structural load requirements. With an investment exceeding £100,000 in an $81 million state-of-the-art manufacturing facility, 2h Storage Solutions was tasked with the design and drafting work necessary for the primary storage of complete train set components. The design phase spanned approximately 12 months, featuring various bay depths to cater to larger pallets in specific areas.

Pallet Racking Standard APR Installation Hitachi

 

Pallet-Racking-Hitachi-Warehouse Aycliffe County Durham

Pallet Racking Installation on a Mezzanine Floor for Vale of Mowbray

This project involved the design and installation of pallet racking atop a new concrete mezzanine floor for Vale of Mowbray, requiring extensive collaboration with structural engineers, architects, and the principal contractor to ensure compliance with technical and structural load specifications. With a project investment of £9,000, 2h Storage Solutions was engaged for detailed drawing and design work. The design phase, which lasted 18 months, evaluated options including pushback, drive-in, and finally, APR pallet racking systems to optimize storage efficiency.

 

Pallet Racking Installation Yorkshire Food Manufacture

Pallet Racking on top of a Mezzanine Floor: for Vale of Mowbray Pork Pie Manufacture