Bespoke Design of Racking System for Hitachi

Pallet Racking Standard APR:  for Hitachi Rail Europe Limited – Rolling Stock Manufacture

 

Project requirements: Design of bespoke racking system to service a wide range of differing parts, pallets and train sub components, technical and structural loadings, and installation.

Project investment: £100K plus to be installed in this £81 million pound state of art manufacturing facility.

Project detail: 2h Storage Solutions were retained to complete drawing and design work for pallet racking to provide the main facility on site for complete train sets components storage.

The design phase of this project ran for around 12 months with differing bay depths to accommodate larger pallets in some area.

 

Construction Date: August 2016
Location: Newton Aycliffe, County Durham