Complete Warehouse Fit-Out for Tremco

Warehouse Fit Out Distribution Centre - Turn key solutions for Tremco

2h Storage Solutions provided a full turnkey solution for Tremco.

Project requirements: To design and fit out a central distribution centre for 16,000 pallets with capabilities to store flammable products all works to be completed within 6 months.

Project detail:
To install:

  • VNA pallet racking installation
  • DC Fire Alarm
  • DC Flammable rooms
  • Small power
  • Aerosol Cage
  • External Loading Canopy
  • FM sprinkler system
  • Hydrant mains
  • Pump House
  • Electrical containment main warehouse (at roof level)
  • LV Distribution (forming part of M&E Package)
  • Warehouse false ceiling
  • DC warehouse & canopy lighting
  • CCTV
  • Data cabling for SAP warehouse management system terminals
  • DC Intruder Alarm
  • Office Fit out
  • Aerosol cage
  • DC Door Access
  • Warehouse PA systems

 

 

Warehouse Fit Out Distribution Centre - Turn key solutions for Tremco

 

 

FM Global Approved Sprinkler Pump

 

Underground Hydrant Mains Pipe

 

Warehouse External Loading Canape

 

Folklift Charging Stations

 

Flammable Room Storage

 

Sprinkler Water System

Comments are closed

A Fond Farewell to Laura


We are pleased to share that Laura has chosen to retire at the end of January, beginning a new chapter of early retirement and well deserved leisure. Laura has decided to step away from work entirely and will not be taking on any future roles or commitments. While we are excited for her as she embraces this next phase, we will miss her valued contributions and the positive influence she has had throughout her time with us. We are deeply grateful for everything she has brought to 2h and wish her every happiness in her retirement.

This will close in 30 seconds