Complete Warehouse Fit-Out for Tremco
Complete Warehouse Fit-Out for Tremco
2h Storage Solutions provided a full turnkey solution for Tremco.
Project requirements: To design and fit out a central distribution centre for 16,000 pallets with capabilities to store flammable products all works to be completed within 6 months.
Project detail: To install:
- VNA pallet racking installation
- DC Fire Alarm
- DC Flammable rooms
- Small power
- Aerosol Cage
- External Loading Canopy
- FM sprinkler system
- Hydrant mains
- Pump House
- Electrical containment main warehouse (at roof level)
- LV Distribution (forming part of M&E Package)
- Warehouse false ceiling
- DC warehouse & canopy lighting
- CCTV
- Data cabling for SAP warehouse management system terminals
- DC Intruder Alarm
- Office Fit out
- Aerosol cage
- DC Door Access
- Warehouse PA systems