Pallet Racking on top of a Mezzanine Floor: for Vale of Mowbray Pork Pie Manufacture
Project Requirements: Design including working with structural engineers architect and Principle Contractor, technical and structural loadings, and installation.
Project Investment: £9K
Project Detail: 2h Storage Solutions were retained to complete drawing and design work for pallet racking to be located on top of a concrete mezzanine floor project.
The design phase of this project ran for 18 months as we looked at pushback, drive in and eventually APR pallet racking to be located on top of a new concrete mezzanine floor.